Veolia Leeds

Waste To Energy

Contract Value: £1M

CSW process are proud to have been involved in the waste to energy scheme that will provide sustainable energy to the Leeds District.

We were chosen to install both internal and external pipelines. The contract comprised of 20" steam and condensates direct from the turbine hall feeding a newly installed pulping plant.

Additionally, future connections were installed to allow St James hospital to take advantage of the waste steam from the state-of-the-art incinerator.

Broughton House & Victoria Street - District Heating

CSW Process Ltd operated as the main contractor on these Phase 1 and 2 district heating projects. 

Our team managed the installation of Bristol City's new network of underground pre-insulated piping that will deliver affordable, low-carbon heat across the city to domestic, public, and commercial buildings

CSW Process LTD - Welding DH pipe underground (1 of 1).jpg
CSW Process LTD - Welding DH pipe 1 (1 of 1).jpg

Bristol City Council

Contract Value: £1.1M

Bristol City Council

CSW Process LTD - Welding DH pipe (1 of 1).jpg
CSW Process LTD - Bristol City Centre (1 of 1).jpg

Old Market Network - District Heating

Contract Value: £4.5M

Bristol city council are broadening their heat network with an aim to become carbon-neutral by 2050.

This project was phase 3 of the larger scheme to establish more buildings across the city as carbon neutral. CSW Process operated as the main contractor on this project. Our works carried out included civil engineering, installation, supply, and maintenance of district heating pre-insulated pipes, building connections to the heat network, build, supply, and maintenance of substations, and internal works.

Bristol City Council

Redcliffe District Network

Contract Value: £3.8M

CSW Process LTD - Bristol City Centre DH trench prep for pipe  (1 of 1).jpg
CSW Process LTD - Filling in the paving 1 (1 of 1).jpg

Bristol city council are broadening their heat network with the aim to become carbon-neutral by 2050.

This project was phase 4 of the larger scheme to establish more buildings across the city as carbon neutral. CSW Process operated as the main contractor on this project. Our works carried out included civil engineering, installation, supply, and maintenance of district heating pre-insulated pipes, building connections to the network, build, supply, and maintenance of substations, and internal works.

CSW Process LTD - Bristol City Centre DH (1 of 1).jpg
CSW Process LTD - STOR site  (1 of 1).jpg

Bristol City Council

PSDS

Contract Value: £1.9M

This project was part of the larger scheme to establish more buildings across the city as carbon neutral. CSW Process operated as the main contractor on this project. Our works carried out included civil engineering, installation, supply, and maintenance of district heating pre- insulated pipes, building connections to the network, and repair work.